blog

Home > blog

National Standard OF The Grinding Balls In China(9)

Release time:2021-10-22

MEASUREMENT AND CALCULATION OF THE GRINDING BALLS BROKEN RATE

Under the normal working condition of the ball mill, the ball mill runs from 720h to 3000h (according to the working conditions, and the specific time is agreed by both the supplier and the buyer).  Accumulated the mass of the broken balls during the ball mill operation, call it as the mass. The broken balls left in the ball mill are then picked up, weighed, and the total weight of the balls used during this period is measured.


The fraction of broken balls is calculated according to the following formula (B1):



ρ ——broken rate,%;

Q ——initial loading balls weight,t;

Q’ ——Quantity of the grinding balls during the normal working,t;

Q1 ——The mass of the broken balls during the normal working,t;

Q2 ——Top ball mill and do the test, the mass of the broken balls in the ball mill,t.


Service Hotline

+86 18756355533

Betty 86 158 5636 2791

Star  86 18756355533 starwang577322@foxmail.com

Address: Heli Industrial Zone, Ningguo City, Xuancheng, Anhui Province, China.

Product

molding line

metal mold

heat treatment furnace

grinding media

Ball Production Ancillary Facility

Wrench

Mobile

Ningguo Dexin New Material Co., Ltd. all rights reserved  辰光云统计平台